Experience

Project Info:
Owner:
City of Manchester, NH

Technologies/Materials:
Primary clarifier and gravity thickner upgrades

Engineer:
Underwood Engineers

Project Value:
$7.6 Million

Project Highlights:
Methuen Construction performed all excavation and concrete for this project.


Download Project PDF

Manchester Primary Clarifier Upgrades - Manchester, NH

At the Manchester, NH wastewater treatment facility, Methuen Construction upgraded three 130' diameter primary clarifiers and three 50' diameter gravity thickners. All excavation, concrete work, piping, pumps, HVAC, and electrical was included in the work at the water treatment plant.