Project Info:
Owner:
Schnitzer Steel Industries
Technologies/Materials:
Steel framed enclosures and equipment installations
Engineer:
Waldron Engineering
Project Value:
$8.0 Million
Project Highlights:
The project supports the new emissions control system at the steel recycling facility
Owner:
Schnitzer Steel Industries
Technologies/Materials:
Steel framed enclosures and equipment installations
Engineer:
Waldron Engineering
Project Value:
$8.0 Million
Project Highlights:
The project supports the new emissions control system at the steel recycling facility
Everett Emissions Control Equipment Support - Everett, MA
A new emissions control system is being installed at the Schnitzer Steel Industries scrap metal shredding facility in Everett, MA. Methuen Construction is providng the labor, materials, equipment, tools and supplies to install steel framed enclosures, support structures, procured equipment and assoicated architectuaral, mechanical, and electrical work in support of the shredder emissions control project.