Project Info:
Owner:
Westover Air Force Base, Westover, MA
Technologies/Materials:
Steam Boilers & Automatic Temperature Control
Engineer:
United States Air Force
Project Value:
$950,000
Project Highlights:
All aspects of the project were closely coordinated with the Air Force
Owner:
Westover Air Force Base, Westover, MA
Technologies/Materials:
Steam Boilers & Automatic Temperature Control
Engineer:
United States Air Force
Project Value:
$950,000
Project Highlights:
All aspects of the project were closely coordinated with the Air Force
Chicopee Automatic Temperature Control System - Chicopee, MA
This project included the demolition and installation of new hot water and steam boilers in five different base buildings.
In addition to the Boilers, new piping and associated pumps were installed. All work was closely coordinated with base
operations for a phased-in demolition and start up period that not only impacted heat and hot water to the various facilities, but also required close coordination with Base Operations and their plane washing requirements.