Project Info:
Owner:
Westover Air Force Base, Westover, MA

Technologies/Materials:
Steam Boilers & Automatic Temperature Control

Engineer:
United States Air Force

Project Value:
$950,000

Project Highlights:
All aspects of the project were closely coordinated with the Air Force


Download Project PDF

Chicopee Automatic Temperature Control System - Chicopee, MA

This project included the demolition and installation of new hot water and steam boilers in five different base buildings.
In addition to the Boilers, new piping and associated pumps were installed. All work was closely coordinated with base
operations for a phased-in demolition and start up period that not only impacted heat and hot water to the various facilities, but also required close coordination with Base Operations and their plane washing requirements.