Project Highlights:
All activities were performed without interruption to normal wastewater treatment operations


Download Project PDF

Clinton Temporary Soda Ash Silo - Clinton, MA

The Industrial Services Group provided the design, fabrication, assembly and startup of the temporary Soda Ash Silo for the Clinton, MA Wastewater Treatment Facility (WWTF). The work included furnishing and installing modifications to the existing soda ash feed system, disposal of the equipment demolished during the installation of the modifications, providing a temporary soda ash feed system during construction at the treatment facility.

All work activities, were sequenced and coordinated without any unscheduled interruptions to wastewater treatment operations.