Experience

Project Info:
Owner:
Ogden Martin Haverhill Associates

Technologies/Materials:
Eddy Current Non-Ferrous Separation

Engineer:
Dufresne Henry

Project Value:
$2.4 Million

Project Highlights:
The system was required to remove more than 90% of incoming metals.


Download Project PDF

Haverhill Non-Ferrous Recovery System - Haverhill, MA

The client provided Methuen Construction with a performance specification that outlined their requirements and desired system components. The system was required to remove more than 90% of incoming metals while operating at a rate of 70 tons per hour, 10 hours per day, 6 days per week. The client further specified that the non-ferrous system be designed as a batch system and that it be configured to fit within their existing ash building.