Experience
Project Info:
Owner:
Town of Wayland
Technologies/Materials:
Membrane Filtration System
Engineer:
Tata & Howard
Project Value:
$8 Million
Project Highlights:
This project was done without impacting the fragile Baldwin Pond ecosystem.
Owner:
Town of Wayland
Technologies/Materials:
Membrane Filtration System
Engineer:
Tata & Howard
Project Value:
$8 Million
Project Highlights:
This project was done without impacting the fragile Baldwin Pond ecosystem.
Wayland Membrane Ultra Filtration - Wayland, MA
Methuen Construction was the General Contractor for this project to construct a 1.5 million gallon per day Water Treatment Facility utilizing Membrane Ultra Filtration to remove iron and manganese from the Wayland drinking water supply. Work included construction of a new Masonry building above concrete holding tanks, replacement of existing well pumps, Ozone Generation, Compressed Air, Membrane Filtration, Chemical Feed, and SCADA systems.