Experience

Project Info:
Owner:
Anheuser-Busch

Technologies/Materials:
Cooling & Dehumidification Systems

Engineer:
Anheuser-Busch

Project Value:
$2.8 Million

Project Highlights:
Constricted space required portions of equipment to be inserted into the facility via access holes and reassembled inside.


Download Project PDF

Merrimack Brewery Cooling & Dehumidification - Merrimack, NH

Working in partnership with Anheuser-Busch and four independent subcontractors, Methuen Construction strategically demolished and removed existing space conditioning equipment and process piping within the five levels of the facility and replaced the systems in their entirety. Work required exhaustive rigging and setting of large pieces of equipment, which, in some cases, necessitated disassembly outside the facility and insertion into the building via access holes cut in the exterior. Equipment was then reassembled on location, during which time the brewery operated at normal production levels.