Experience
Project Info:
Owner:
Enel Green Power North America Inc.
Technologies/Materials:
Control Gate Reconstruction
Engineer:
Enel Green Power
Project Value:
Confidential
Project Highlights:
The hardware from the original timbers was salvaged and reinstalled on the new timbers onto the existing gates.
Owner:
Enel Green Power North America Inc.
Technologies/Materials:
Control Gate Reconstruction
Engineer:
Enel Green Power
Project Value:
Confidential
Project Highlights:
The hardware from the original timbers was salvaged and reinstalled on the new timbers onto the existing gates.
Lawrence Historic Hydro Dam Reconstruction - Lawrence, MA
The Methuen Industrial Services Group provided the skills to repair existing Control Gates for a Hydro Electric Dam. The Industrial Services Group obtained white oak timbers to replace the original timbers. They then cut and shaped them to match the original members installed in 1883. The hardware from the original timbers was salvaged and reinstalled on the new timbers.