Experience
Project Info:
Owner:
Spincraft, North Billerica, MA
Technologies/Materials:
Concrete Slab Placement, Asbestos Removal
Architect:
Terracon Consulting
Engineer:
EnviroVantage (Asbestos Removal)
Project Value:
$3.2 Million
Project Highlights:
The discovery of asbestos contaminated soil, required the development of a comprehensive removal plan
Owner:
Spincraft, North Billerica, MA
Technologies/Materials:
Concrete Slab Placement, Asbestos Removal
Architect:
Terracon Consulting
Engineer:
EnviroVantage (Asbestos Removal)
Project Value:
$3.2 Million
Project Highlights:
The discovery of asbestos contaminated soil, required the development of a comprehensive removal plan
North Billerica Asbestos Removal - North Billerica, MA
Methuen Construction was the general contractor for this project at Spincraft in North Billerica, MA. Initial scope was preparing an existing area to support a Carnaghi Vertical Turning Center, which Spincraft uses to create complex metal fabrications for the aerospace, defense, and energy industries. Work consisted of: demolition of a concrete floor slab, dewatering and excavation with engineered support in order to form and place a concrete foundation measuring 60’x55’ inside an existing facility. Prior to starting construction, the soil was found to be contaminated with asbestos, which required the project team to develop a comphrensive plan to address the asbestos contamination.